Pre-removal and Post-installation Operation
|
Removal steps | |||
1. | EGR gas temperature sensor | ||
2. | Gasket | ||
3. | Oil level gauge and guide | ||
4. | O-ring | ||
• | Supply pump (Refer to Engine – Diesel Fuel <4N1> – SUPPLY PUMP REMOVAL AND INSTALLATION) | ||
• | Glow plug No.2 connector connection (Refer to Engine – Engine Electrical – Glow System <4N1> – GLOW PLUG REMOVAL AND INSTALLATION) | ||
• | Vacuum hose A (Refer to Engine – Engine Overhaul <4N1> – SOLENOID VALVE AND VACUUM HOSE REMOVAL AND INSTALLATION) | ||
• | Vacuum tube assembly (Refer to Engine – Engine Overhaul <4N1> – SOLENOID VALVE AND VACUUM HOSE REMOVAL AND INSTALLATION) | ||
• | Glow plug No.4 connector connection (Refer to Engine – Engine Electrical – Glow System <4N1> – GLOW PLUG REMOVAL AND INSTALLATION) | ||
5. | Inlet manifold | ||
6. | Inlet manifold gasket |