STEERING - ELECTRIC POWER STEERING (EPS) - TROUBLESHOOTING - CIRCUIT DIAGNOSIS PROCEDURE - POWER SUPPLY AND EARTH CIRCUIT
Diagnosis Procedure: Power supply and earth circuit
N5072110I0000600ENG
1.CHECK THE IGNITION SWITCH SIGNAL
With M.U.T.-III SE
  1. Select “EPS/DAST 3”, “Data List” and item No. 39 “Ignition SW” in this order.
  2. Ignition switch OFF.
  3. Check that the item is “OFF”.
  4. Ignition switch ON.
  5. Check that the item is “ON”.
Is the inspection result normal?
YES
NO
Perform the trouble diagnosis for relay control unit. Refer to DIAGNOSIS CODE CHART
2.CHECK ACC POWER SUPPLY FOR EPS-ECU
  1. Pull the parking brake lever assembly.
  2. Ignition switch OFF.
  3. Get out of the vehicle and close all doors.
  4. Wait 65 seconds.
  5. Disconnect EPS-ECU harness connector.
  6. Check voltage between EPS-ECU harness connector terminals and body earth.
    (+)
    (—)
    Voltage
    EPS-ECU
    Connector
    Terminal
    A-57
    5
    Body earth
    Approx. 0 V
  7. Ignition switch ON.
    CAUTION:
    Never start the engine.
  8. Check voltage between EPS-ECU harness connector and body earth.
    (+)
    (—)
    Voltage
    EPS-ECU
    Connector
    Terminal
    A-57
    5
    Body earth
    10.5 – 16 V
Is the inspection result normal?
YES
NO
3.CHECK ACC POWER SUPPLY CIRCUIT FOR EPS-ECU
  1. Pull the parking brake lever assembly.
  2. Ignition switch OFF.
  3. Get out of the vehicle and close all doors.
  4. Wait 65 seconds.
  5. Check the 5A fuse (#33).
  6. Check continuity between EPS-ECU harness connector and the fuse block (J/B).
    EPS-ECU
    Fuse block (J/B)
    Continuity
    Connector
    Terminal
    Connector
    Terminal
    A-57
    5
    C-311
    10
    Existed
Is the inspection result normal?
YES
Perform the trouble diagnosis for ignition power supply circuit.
NO
Repair / replace harness, connector, or fuse.
4.CHECK 12V BATTERY POWER SUPPLY FOR EPS-ECU
  1. Pull the parking brake lever assembly.
  2. Ignition switch OFF.
  3. Get out of the vehicle and close all doors.
  4. Wait 65 seconds.
  5. Check voltage between EPS-ECU harness connector terminals and body earth.
    (+)
    (—)
    Voltage
    EPS-ECU
    Connector
    Terminal
    A-58
    12
    Body earth
    10.5 – 16 V
  6. Ignition switch ON.
    CAUTION:
    Never start the engine.
  7. Check voltage between EPS-ECU harness connector terminals and body earth.
    (+)
    (—)
    Voltage
    EPS-ECU
    Connector
    Terminal
    A-58
    12
    Body earth
    10.5 – 16 V
Is the inspection result normal?
YES
NO
5.CHECK 12V BATTERY POWER SUPPLY CIRCUIT FOR EPS-ECU
  1. Pull the parking brake lever assembly.
  2. Ignition switch OFF.
  3. Get out of the vehicle and close all doors.
  4. Wait 65 seconds.
  5. Check the 100A fusible link (#H).
  6. Check the harness for open or short between EPS-ECU harness connector No.7 terminal and the 100A fusible link (#H).
Is the inspection result normal?
YES
Perform the trouble diagnosis for power supply circuit.
NO
Repair / replace harness, connector, or fusible link.
6.CHECK EPS-ECU EARTH CIRCUIT
Check continuity between EPS-ECU harness connector and body earth.
EPS-ECU
(—)
Continuity
Connector
Terminal
A-58
11
Body earth
Existed
Is the inspection result normal?
YES
NO
Repair / replace harness or connector.
7.CHECK TERMINAL
  1. Pull the parking brake lever assembly.
  2. Ignition switch OFF.
  3. Get out of the vehicle and close all doors.
  4. Wait 65 seconds.
  5. Check EPS-ECU terminals for damage or loose connection with harness connector.
  6. Check fuse block (J/B) terminals for damage or loose connection with harness connector.
Is the inspection result normal?
YES
INSPECTION END
NO
Repair / replace harness, connector, or terminal.
BookmarkedToo many bookmarks.
Please delete and bookmark again.