Pre-removal Operation
| Post-installation Operation
|
Removal steps | |||
1. | Breather hose connection | ||
2. | PCV hose connection | ||
• | Ignition coil (Refer to Engine – Engine Electrical – Ignition System <4G6> – IGNITION COIL REMOVAL AND INSTALLATION). | ||
3. | Timing belt front upper cover | ||
4. | Engine hanger | ||
5. | Rocker cover assembly | ||
6. | Rocker arm and shaft assembly | ||
7. | Valve spring retainer lock | ||
8 | Valve spring retainer | ||
9. | Valve spring | ||
10. | Valve stem seal | ||
11. | Valve spring seat |
|