Pre-removal Operation
| Post-installation Operation
|
Removal steps | |||
• | Vacuum hose (Refer to Brakes – Basic Brake – MASTER CYLINDER ASSEMBLY AND BRAKE BOOSTER ASSEMBLY REMOVAL AND INSTALLATION) | ||
• | Vacuum pipe (Refer to Engine – Engine Overhaul – SOLENOID VALVE AND VACUUM HOSE REMOVAL AND INSTALLATION) | ||
• | Vacuum hose (B) (Refer to Brakes – Basic Brake –MASTER CYLINDER ASSEMBLY AND BRAKE BOOSTER ASSEMBLY REMOVAL AND INSTALLATION) | ||
1. | Engine control harness | ||
• | Injector lower insulator (Refer to Engine – Engine Mechanical – ENGINE ASSEMBLY REMOVAL AND INSTALLATION) | ||
• | Engine control harness bracket (Refer to COMMON RAIL REMOVAL AND INSTALLATION) | ||
2. | Fuel return hose D (Fuel leakage pipe side) connection | ||
3. | Eye bolt | ||
4. | Fuel leakage pipe assembly | ||
5. | Fuel return gasket | ||
6. | Fuel injection pipe No. 1 | ||
7. | Fuel injection pipe No. 2 | ||
8. | Fuel injection pipe No. 3 | ||
9. | Fuel injection pipe No. 4 | ||
10. | Fuel injector assembly | ||
11. | Fuel injector washer | ||
12. | Fuel injector holder | ||
13. | Fuel injector nozzle gasket |