>>A<< TURBO CHARGER ASSEMBLY/OIL RETURN PIPE GASKET/OIL RETURN PIPE B/OIL RETURN HOSE B/FUEL RETURN GASKET/OIL PIPE A/OIL PIPE B INSTALLATION
Check the internal surface, the eye bolt and the mating surface of the oil pipe and water pipe for clogging, and clean if necessary.
CAUTION:
Be careful not to allow foreign material to enter the turbocharger.
If deposits of carbon are accumulated on the turbocharger oil passage, remove them and clean using the compressed air.
Add clean engine oil through the oil feed pipe port on the turbocharger.
Assemble the following parts to the turbocharger assembly before installing the turbocharger assembly to the exhaust manifold.
Assemble the following parts to the low pressure turbocharger.
Oil return pipe B: Tighten the oil return pipe B mounting bolts to the specified torque.
Tightening torque: 9.5 ± 2.5 N·m
Oil return pipe gasket (On oil return pipe B): The tab on the gasket should be positioned as shown.
Oil return hose B.
Oil pipe A: Temporarily tighten the eye bolt.
Fuel return gasket (On oil pipe A)
Assemble the following parts to the high pressure turbocharger.
Install the parts assembled in above step.
Temporarily tighten the eye bolt for the oil pipe B on the high pressure turbocharger side by hand to extent that it does not seat to the installation surface.
CAUTION:
The detent must be placed between the edge of the eye joint and the wall of the turbocharger as shown in the illustration.
As shown in the illustration, set a Φ10.5 mm drill blade (recommended) to the high pressure turbocharger side as a detent.
Temporarily tighten the oil pipe B flange bolt on the water pump side by hand (2 to 3 threads).
Temporarily tighten the eye bolt for the oil pipe B on the cylinder block side by hand (2 to 3 threads).
Temporarily tighten the oil pipe B flange bolt on the water pump side to the specified torque.
Tightening torque: 0.3 ± 0.2 N·m
Temporarily tighten the eye bolt for the oil pipe B on the cylinder block side to the specified torque.
Tightening torque: 1.1 ± 0.9 N·m
Remove the anti-rotation jig from the high pressure turbocharger side.
Temporarily tighten the eye bolt for the oil pipe B on the high pressure turbocharger side to the specified torque.
Tightening torque: 1.8 ± 0.5 N·m
Tighten the oil pipe B flange bolt on the water pump side to the specified torque.
Tightening torque: 9.0 ± 1.0 N·m
Tighten the eye bolt for the oil pipe B on the cylinder block side to the specified torque.
Tightening torque: 17 ± 2 N·m
Tighten the eye bolt for the oil pipe B on the high pressure turbocharger side to the specified torque.
Tightening torque: 17 ± 2 N·m
Temporarily tighten the eye bolt for the oil pipe A on the low pressure turbocharger side by hand, and let the mounting bolt be seated (until the bolt slightly touches the installation surface).
Temporarily tighten the eye bolt for the oil pipe A on the cylinder head side by hand, and let the mounting bolt be seated (until the bolt slightly touches the installation surface).
Tighten the eye bolt for the oil pipe A on the low pressure turbocharger side to the specified torque.
Tightening torque: 17 ± 2 N·m
Tighten the eye bolt for the oil pipe A on the cylinder head side to the specified torque.
Tightening torque: 17 ± 2 N·m
>>B<< OIL RETURN PIPE GASKET (ON OIL RETURN PIPE A) INSTALLATION
Install the oil return pipe gasket as its projection is in the direction shown.
>>C<< TURBOCHARGER GASKET INSTALLATION
Install the turbocharger gasket as its projection is in the direction shown.
>>D<< AIR INLET FITTING GASKET INSTALLATION
Install the air inlet fitting gasket as its projection is in the direction shown.