ENGINE - ENGINE AND EMISSION CONTROL - EMISSION CONTROL<4N1> - UREA SCR SYSTEM<EURO 6B OR EURO 6C> - UREA INJECTOR, UREA FEED TUBE
UREA INJECTOR, UREA FEED TUBE REMOVAL AND INSTALLATION
N502630690000J00ENG
CAUTION:
  • After urea SCR system related parts are replaced, use the M.U.T.-III SE to execute each command by referring to action to be taken when urea SCR system related parts are replaced (Refer to ACTION TO BE TAKEN WHEN UREA SCR SYSTEM RELATED PARTS ARE REPLACED).
  • Put the disconnected pipes and connectors in a plastic bag respectively to prevent dust from adhering to them.
  • If any AdBlue® gets on painted surfaces, wash it off immediately with clean water.
  • If the AdBlue® is adhered to the vehicle, wipe the area with a wet cloth.
Pre-removal Operation
Post-installation Operation
Urea injector assembly removal steps
1.
Water hose L connection
2.
Water pipe O connection
3.
Urea line tube A connection
•
Exhaust tube clamp (Refer to CATALYTIC CONVERTER REMOVAL AND INSTALLATION)
4.
Assembly composed of main catalytic converter, urea line clamp, urea injector assembly and urea injector gasket
5.
Urea line clamp
6.
Urea injector assembly
7.
Urea injector gasket
•
Main catalytic converter (Refer to CATALYTIC CONVERTER REMOVAL AND INSTALLATION)
Urea line tube removal steps
•
Transmission assembly (Refer to Transmission & Driveline – Manual Transmission – TRANSMISSION ASSEMBLY REMOVAL AND INSTALLATION) <M/T-4WD>
•
Transmission assembly (Refer to Transmission & Driveline – Automatic Transmission – TRANSMISSION ASSEMBLY REMOVAL AND INSTALLATION) <A/T-4WD>
8.
Urea line tube A
•
Fuel tank assembly (Refer to Engine – Fuel Supply – FUEL TANK REMOVAL AND INSTALLATION)
9.
Urea line tube B
INSTALLATION SERVICE POINT
>>A<< UREA LINE CLAMP INSTALLATION
Close the clamp hook of the urea line clamp until it is locked, then tighten it to the specified torque.
Tightening torque: 11 ± 1 N·m
BookmarkedToo many bookmarks.
Please delete and bookmark again.