Pre-removal Operation
| Post-installation Operation
|
Removal steps | |||
1. | Urea line tube C heater connector connection | ||
2. | Urea line tube B heater connector connection | ||
3. | Urea leveling tube assembly connection | ||
4. | Urea ventilation tube assembly connection | ||
5. | Urea filler hose C assembly connection | ||
• | Draining AdBlue® <only at removal> | ||
6. | Self locking flange nut | ||
7. | Urea tank and protector assembly |