ENGINE - ENGINE AND EMISSION CONTROL - EMISSION CONTROL<4N1> - UREA SCR SYSTEM<EURO 6B OR EURO 6C> - ON-VEHICLE SERVICE
UREA LINE TUBE CHECK
N502630970000500ENG
Urea Line Tube Location
Check Procedure
CAUTION:
  • When connecting the connector, do not damage or drop the O-ring.
  • After connecting the connector, lightly pull the connector to check that it does not come off, and it moves a small amount (1 to 3 mm) in the axial direction.
Urea line tube A check
Remove the engine room under cover front (Refer to  Body Exterior, Doors, Roof & Vehicle Security – Exterior – UNDER COVER REMOVAL AND INSTALLATION).
Disconnect the connection of connector (b) and connector (c).
Check the tube for leaking by the following procedures.
Remove the joint connecting connector (b) and connector (c), then install the joint to the hand pump (positive pressure type).
Connect the hand pump (positive pressure type) to connector (b).
Apply a pressure of 50 kPa to connector (b) and check that the pressure is maintained for 30 seconds or more.
  • When the pressure is maintained, the tube is not leaking. Go to Step 4.
  • When the pressure is not maintained, the tube is leaking. Replace the urea line tube A, then go to urea line tube B check.
Check the tube for clogging by the following procedures.
Disconnect connector (a).
Apply pressure to connector (b) using the hand pump (positive pressure type).
  • When the pressure is not maintained, the tube is not clogged. Connect connector (a), then go to urea line tube B check.
  • When the pressure is maintained, the tube is clogged. Replace the urea line tube A and connect connector (a), then go to urea line tube B check.
Urea line tube B check
Check the tube for leaking by the following procedures.
Connect the joint to connector (b) or connector (c).
Connect the connection of connector (b) and connector (c).
Disconnect the connection of connector (d) and connector (e).
Remove the joint connecting connector (d) and connector (e), then install the joint to the hand pump (positive pressure type).
Connect the hand pump (positive pressure type) to connector (d).
Apply a pressure of 50 kPa to connector (d) and check that the pressure is maintained for 30 seconds or more.
  • When the pressure is maintained, the tube is not leaking. Go to Step 2.
  • When the pressure is not maintained, the tube is leaking. Replace the urea line tube B, then go to urea line tube C check.
Check the tube for clogging by the following procedures.
Disconnect the connection of connector (b) and connector (c).
Apply pressure to connector (d) using the hand pump (positive pressure type).
  • When the pressure is not maintained, the tube is not clogged. Connect connector (b) and connector (c), then go to urea line tube C check.
  • When the pressure is maintained, the tube is clogged. Replace the urea line tube B and connect connector (b) and connector (c), then go to urea line tube C check.
Urea line tube C check
Remove the urea tank protector (front side and lower).
Check the tube for leaking by the following procedures.
Connect the hand pump (positive pressure type) to connector (e).
Apply a pressure of 50 kPa to connector (e) and check that the pressure is maintained for 30 seconds or more.
  • When the pressure is maintained, the tube is not leaking. Go to Step 3.
  • When the pressure is not maintained, the tube is leaking. Replace the urea line tube C, then go to Step 4.
Check the tube for clogging by the following procedures.
Disconnect connector (f).
Apply pressure to connector (e) using the hand pump (positive pressure type).
  • When the pressure is not maintained, the tube is not clogged. Connect connector (f), then go to Step 4.
  • When the pressure is maintained, the tube is clogged. Replace the urea line tube C and connect connector (f), then go to Step 4.
Connect the joint to connector (d) or connector (e).
Connect the connection of connector (d) and connector (e).
Install the urea tank protector (front side and lower).
BookmarkedToo many bookmarks.
Please delete and bookmark again.